5.15 CDCA-I015: (input) Reporting metering system faults


Interface ID:

CDCA-I015



Source:

MOA


Title:

Reporting metering system faults.



BSC reference:

CDCA SD 11.1-11.4

BPM , CP756


Mechanism:

Manual, by email, letter or fax



Frequency:

As required



Volumes:

estimate 10 per day (0.2% of 5000)



Interface Requirement:

The CDCA receives reports from the MOA in respect of Metering Equipment faults.


This includes free format text which could be communicated by a letter, email, fax or phone call.



Physical Interface Details:




5.16 CDCA-I017: (output) Meter Reading Schedule for MAR


Interface ID:

CDCA-I017



User:

BSC Party, MOA



Title:

Meter Reading Schedule for MAR



BSC reference:

CDCA SD 12.1

BPM


Mechanism:

Manual


Frequency:

Annual


Volumes:

One schedule for all metering systems



Interface Requirement:

The CDCA issues a Meter Reading Schedule for MAR for each metering system on an annual basis, at least three months ahead and forward it to the relevant BSC Parties trading at the metering system, and the MOA responsible for the maintenance of the metering system.
The Schedule will contain, for each Metering System:
BSC Party

Metering System Id

Metering System Location Details

Planned date of Site Visit




Physical Interface Details:

No physical structure is defined for this flow




5.17 CDCA-I018: (output) MAR Reconciliation Report


Interface ID:

CDCA-I018



User:

BSC Party, MOA, BSCCo Ltd,

Distribution Business


Title:

MAR Reconciliation Report



BSC reference:

CDCA SD 12.6, 19.2

CDCA BPM 4.2

CN116 CP1153



Mechanism:

Manual


Frequency:

As Required



Volumes:

100 per working day based upon 5000 metering systems



Interface Requirement:

The results of each Meter Advance Reconciliation is provided to the relevant BSC Party(s) with a reconciliation report detailing the actual difference calculated for each active energy meter or associated outstation register.


The MAR report is sent to the relevant BSC Party, the relevant MOA, and, if appropriate, any other parties such as the Distribution Business. It may also be sent to BSCCo Ltd for dispute resolution. The information, for each metering system, includes:
Metering System Identifier

Advance Period Start Date

Advance Period End Date

Original Energy volume reading for all relevant channels (MWh) (e.g. main, check, active, reactive etc.)

MAR Energy volume reading for all relevant channels

Percentage Variation

BSCP Requirement

Compliance Indicator (T/F)

Import/Export Indicator (I/E)
The Import/Export indicator indicates the direction of the energy flow: the Meter Volume is therefore unsigned.



Physical Interface Details:




5.18 CDCA-I019: (output) MAR Remedial Action Report


Interface ID:

CDCA-I019



User:

BSC Party, MOA, BSCCo Ltd,

Distribution Business


Title:

MAR Remedial Action Report



BSC reference:

CDCA SD 12.9

BPM 4.2


Mechanism:

Manual


Frequency:

Ad hoc



Volumes:

2 per day based upon 2% of the 100 MARs undertaken each day.



Interface Requirement:

When the CDCA initiates remedial action to resolve a Meter Advance Reconciliation discrepancy, it notifies the interested parties of the remedial action(s) taken. The interested parties are the relevant BSC Party, the relevant MOA, and, if appropriate, any other parties such as the Distribution Business. It may also be sent to BSCCo Ltd for dispute resolution.